We're executing a SSIS package from a Quartz-Job.
Normally, all works well but today suddenly and without changing anything, following error occurred:
Exception occurred in job 'BackupJob'; Exception type: OurException; Exception message: Error occurred in data copier. Source='Microsoft.SqlServer.Dts.Runtime.TaskHost' ErrorCode='-1073450952' SubComponent='SSIS.Pipeline' TypeDescription='SSIS Error Code DTS_E_PRIMEOUTPUTFAILED. The PrimeOutput method on Bst Person 1 returned error code 0xC02020C4. The component returned a failure code when the pipeline engine called PrimeOutput(). The meaning of the failure code is defined by the component, but the error is fatal and the pipeline stopped executing. There may be error messages posted before this with more information about the failure.
' HelpFile='dtsmsg110.rll' HelpContext='0' IdofInterfaceWithError='{B6F6D221-FC27-4F71-B5A0-597583986C28}'
StackTrace:
I have no idea what this means and couldn't find anything on the internet on how to fix it.
I've tried to restart the job 5 times now but every time this error happens...
Have you ever encountered this problem and know how to fix it?
Thanks in advance
Usually when something like this happened I looked at several things:
is there enough space on the disk for backups ?
is everything alright with the security ? (I've seen cases where the machine couldn't connect to the AD directory and because of that the authentication failed at the scheduled time).
Most of the times if I just rerun the job then it will work (because it can connect to the AD machine)
If this doesn't work I recommend trying to run the job in SSIS (Visual Studio debug mode). Maybe you get a more descriptive error message.
Related
I am getting data from Sybase DB (using ODBC Connection) to load into the file using MS-SSIS but in the data flow task while getting from the source its giving the following errors.
:Error: SSIS Error Code DTS_E_PRIMEOUTPUTFAILED. The
PrimeOutput method on returned error code 0x80004005.
The component returned a failure code when the pipeline engine called
PrimeOutput(). The meaning of the failure code is defined by the
component, but the error is fatal and the pipeline stopped executing.
There may be error messages posted before this with more information
about the failure.
I have tried with setting MaxConCurrentExecutions=1 as suggested on some web pages as well.
Using the same connection/same DB is working fine for some instances of Table extraction.
The same extraction works totally fine while running on the Debug mode using MS-Visual Studio SSDT.
This error is only showing up while running through MS-SQL Server Job Agent
I need help to solve this issue. Any help would be appreciated.
I have a package that connects to two different DBs, does some calculations, and then inserts values into each DB. The package worked great in our old env, but migrating it over to the new one has proven pretty unpleasant. We had to switch from Windows Auth to SQL Auth and the Connection Manager test works fine, but I'm getting the following error when attempting to execute my SSIS package from Visual Studio:
SSIS Error Code DTS_E_CANNOTACQUIRECONNECTIONFROMCONNECTIONMANAGER.
The AcquireConnection method call to the connection manager "DB1"
failed with error code 0xC0202009. There may be error messages posted
before this with more information on why the AcquireConnection method
call failed.
[SSIS.Pipeline] Error: OLE DB Source failed the pre-execute phase and returned error code 0xC020801C.
What has me really puzzled is the failing task isn't even the first time that connection is used in the package. Just before reaching that Dataflow task, an Execute SQL Task fires against the same connection and is successful. I can also go into the task itself and hit "Preview" and it returns data.
Does anyone have any ideas where else to look?
I've tried:
setting to 32bit Execution
deleting and recreating the task
delay validation = true
I am having an issue with one of my SSIS projects. I developed this package over a year ago and it has run flawlessly until I upgraded Visual Studio. The original project was in VS Shell 2010. My new version is VS 2017 Pro.
The setup is pretty basic. I am pulling data from a database file (.db) using an ADO.NET source via SQLite3 ODBC driver. It pulls each table and inserts the data into a MS SQL Server table. The Target Server Version is set to SQL Server 2012. It is encrypted with password. When I say I have tried to execute the package, I'm talking within VS.
Here is the issue:
Upon executing, the package will execute the SQL statements that start the processes, when I get to the first data flow that has a pull from the database, a command window flashed briefly and closes. The package completes in error:
[Assignments [290]] Error: The Assignments was unable to process the data. Object reference not set to an instance of an object.
[Resources [801]] Error: The Resources was unable to process the data. Object reference not set to an instance of an object.
[Entries [657]] Error: The Entries was unable to process the data. Object reference not set to an instance of an object.
[SSIS.Pipeline] Error: SSIS Error Code DTS_E_PRIMEOUTPUTFAILED. The PrimeOutput method on Resources returned error code 0xC02090F5. The component returned a failure code when the pipeline engine called PrimeOutput(). The meaning of the failure code is defined by the component, but the error is fatal and the pipeline stopped executing. There may be error messages posted before this with more information about the failure.
[SSIS.Pipeline] Error: SSIS Error Code DTS_E_PRIMEOUTPUTFAILED. The PrimeOutput method on Entries returned error code 0xC02090F5. The component returned a failure code when the pipeline engine called PrimeOutput(). The meaning of the failure code is defined by the component, but the error is fatal and the pipeline stopped executing. There may be error messages posted before this with more information about the failure.
[SSIS.Pipeline] Error: SSIS Error Code DTS_E_PRIMEOUTPUTFAILED. The PrimeOutput method on Assignments returned error code 0xC02090F5. The component returned a failure code when the pipeline engine called PrimeOutput(). The meaning of the failure code is defined by the component, but the error is fatal and the pipeline stopped executing. There may be error messages posted before this with more information about the failure.
[Projects [711]] Error: The error "Column data type 66203200 is not supported by the PipelineBuffer class." occurred while processing "Projects.Outputs[ADO NET Source Output].Columns[project_id]".
[Projects [711]] Error: SSIS Error Code DTS_E_INDUCEDTRANSFORMFAILUREONERROR. The "Projects" failed because error code 0x80131600 occurred, and the error row disposition on "Projects.Outputs[ADO NET Source Output].Columns[project_id]" specifies failure on error. An error occurred on the specified object of the specified component. There may be error messages posted before this with more information about the failure.
[Projects [711]] Error: The Projects was unable to process the data. Pipeline component has returned HRESULT error code 0xC0209029 from a method call.
[SSIS.Pipeline] Error: SSIS Error Code DTS_E_PRIMEOUTPUTFAILED. The PrimeOutput method on Projects returned error code 0xC02090F5. The component returned a failure code when the pipeline engine called PrimeOutput(). The meaning of the failure code is defined by the component, but the error is fatal and the pipeline stopped executing. There may be error messages posted before this with more information about the failure.
The odd things is, only some of the data sources in the Data Flow are having issues (3/6).
Here is a list of what I have changed/tired:
- I rebuilt the entire solution using VS 2017 (this worked for ~1 week)
- I tested the ODBC driver(s) (32/64). Both successful.
- I upgraded the project when opening for the first time.
- I recreated the source connection.
- I deleted and recreated the data flow.
- I deleted and recreated each data source. (Preview of data is successful)
- I updated VS to most current patching.
Nothing has worked! Any input would help.
We got this Error in one of our SQL-Jobs tonight:
Error: Executing the query "exec P_ALL" failed with the following error: "Could not locate bookmark due to data movement.". Possible
failure reasons: Problems with the query, "ResultSet" property not set
correctly, parameters not set correctly, or connection not established
correctly.
I can't find any explanation on the web. The MS SQL Server 11.0.7462.6 is running on VMware. It is noticeable that the error came exactly at 03:00:13 am.
I know it is not easy to say, but do you think it is possible, that the VM moved the data and because of that, the Job failed? Do you know other reasons for this error?
The event error log has no further Information.
Thank you for your time!
When I run my SSIS package in Visual Studio it executes just fine. However when I try to execute this same package using the SQL server agent, by either CmdExec or SSIS package type, it gets canceled. The package is stored on the IS catalog. All on the same server.
The standard report tells me task x failed, but is not showing any error messages. I'm sure there is nothing wrong with the task itself as after an DB restore and rerun of the same package with the same data, a different task fails.
I have tried this several times and it always fails because of 1 (out of possible 3) task which are more or less close to each other in the control flow. Moreover the task that fails is only calling a stored procedure, which is completely encapsulated with try-catch.
The standard report is however throwing the following message at the time the package failed:
< ?xml version"1.0"?> < DTS:ProcessMemoryUsage xmlns: DTS=www.microsoft.com/sqlserver/DTS">
< DTS:Peakworkingsetsize>320692224< /DTS.................
which makes me think it has something to do with memory. However can't find anything usefull on google about this message.
I already trying things for a week now but not able to find the solution. Please help?
It might something going on in your tasks. I have noticed the same behavior while running SSAS cube. If it fails, gives not specific error. Try to disable all tasks and enable them one by one in order to find which contains the problem.