The answer depends on whether you want to copy database schema, data, or both.
As Jaxidian said, ApexSQL tools can do the job but as far I know DataDiff will only synchronize database data, while Diff will synchronize schema.
Here is the article describing processes of copying database data:
https://solutioncenter.apexsql.com/how-to-automatically-synchronize-the-data-in-two-sql-server-databases-on-a-schedule/
If you want to copy both schema and data, process is described here:
https://solutioncenter.apexsql.com/how-to-automatically-compare-and-synchronize-multiple-databases-on-different-sql-server-instances/

There are lots of tools available that can accomplish this. Which one is best for you depends on your needs. However, the "Copy" feature in the Azure Portal will not accomplish this for you but can be a partial solution to the approach you finalize on.
I'll make the following assumptions:
You have an always-on 24/7 production load so there are no regularly/nightly/weekly/monthly maintenance windows
You can schedule a maintenance window but you wish to keep it as small as possible
You can easily configure your applications' connectionstrings
Your database isn't huge. Gigabytes is fine.
Your database is mostly static data (i.e. an incremental approach is much faster than a dump-and-fill)
If I were to do this today/right now, my approach would be like this (this is only one option):
Use the Copy feature to make a copy of the database that I can use this as a staging area/reference point while minimizing the load on the Production database
Create a backup (bacpac file) from the copied database
Restore the bacpac file onto your IaaS-hosted SQL Server to form your base deployment
Start your maintenance window and effectively put your database into read-only mode so the data is now no longer changing (lots of strategies on how to do this whether you turn applications off, revoke permissions, etc.)
Use a tool such as ApexSQL Data Diff (Redgate and others have options) to compare data between the two databases and sync the data over to the new IaaS DB. Be careful - depending on your data needs you may have to tweak the generated scripts that sync the data.
Verify that the new DB is now indeed a duplicate copy of your old DB (ApexSQL Data Diff can also help with this - several options exist here)
Change connectionstrings on your apps to point to the new DB
Turn applications back on and end your maintenance window.
So of course, if you do something like this, practice it numerous times and test the results numerous times well before your maintenance window. Get a good idea of the timing for everything, especially how long it will take for you to generate and restore the bacpac file. This is because you want to do that as late as possible before your maintenance window to minimize the time it takes to generate and run the final "Data Diff" script that you'll use. The longer that script takes, the longer your outage will be.

Related

Advice on Azure platform to host Data Warehouse

I am a Data Warehouse developer currently looking into using the Azure platform to host a new Data Warehouse.
My experience is with using on premise servers hosting standard SQL Server Databases, one for the staging database and one for the Data Warehouse. Typically I would use a combination of SSIS and stored procedures running in a scheduled SQL server agent job for the ETL.
How can I replicate this kind of setup within Azure?
The storage size will be less than 1TB so could I just use Azure SQL Server Database over Azure SQL Data Warehouse?
If so would I need separate databases for staging and the data warehouse using the elastic pool option?
The data that I will be loading into staging will all be on premise. Will SSIS still be suitable for loading to Azure or will Azure Data Factory be a better fit?
Any help at all would be greatly appreciated! Thanks.
Leon has lots of good information there. But from a Data Warehouse perspective, I wouldn't use Data Sync for ETL purposes (mensioned as "not preferred" in the link Leon provided, Data Sync, in the list "When to use Data Sync").
For DW, Azure DB is a good option. Azure SQL Data Warehouse (known as Azure Synapse Analytics nowadays) is a heavy duty beast for handling DW. Are you really sure you need this kind of system with < 1Tb data? I'd personnally leave Azure Synaptics for now, and tried with Azure DB first. It's a LOT cheaper and you can upgrade later if necessary.
One thing to note about Azure DB though: Azure DB doesn't support queries over databases. That's not a deal breaker though, everything can be handled in the same database. I personally use a schema to differentiate staging from the DW (and of course I use other schemas in the DW as well). It's not very difficult to use separate databases of course, but the border between them is a lot deeper in Azure DB than on-premise SQL Server or other Azure solutions (Managed Instance for example).
SSIS is still an option, but the problem is, what you use to run the packages? There are options like:
continue running them from on-premise (all the hard work is still done in the cloud)
rent a VM with SQL Server from Azure, deploy the packages to the VM and run them from VM
use Data Factory to run the SSIS packages
None of those are a perfect solution for every use case. First two options come with quite a heavy cost, if running SSIS is the only thing you need them for. Using Data Factory to run SSIS is a bit cumbersome at the moment, but it's an option anyway.
Data Factory itself is a good option as well (I haven't personally tried it, but I have heard good things about it). If you use Data Factory to run your SSIS, why not start using Data Factory without SSIS packages in the first place? Of course Data Factory has some limitations compared to SSIS which might be the reason, but if your SSIS packages are simple enough, why not give Data Factory a try.
I would suggest you using Azure SQL database. It provides many price tier with difference storage for you. You can select the most suitable price tier for you. Azure SQL database also support scale up/down base on the usage.
Ref: Service tiers in the DTU-based purchase model
And as you said, the data that I will be loading into staging will all be on premise.
Azure SQL database has the feature Data Sync can help you do that:
Data Sync is useful in cases where data needs to be kept updated across several Azure SQL databases or SQL Server databases. Here are the main use cases for Data Sync:
Hybrid Data Synchronization: With Data Sync, you can keep data
synchronized between your on-premises databases and Azure SQL
databases to enable hybrid applications. This capability may appeal
to customers who are considering moving to the cloud and would like
to put some of their application in Azure.
Distributed Applications: In many cases, it's beneficial to separate
different workloads across different databases. For example, if you
have a large production database, but you also need to run a
reporting or analytics workload on this data, it's helpful to have a
second database for this additional workload. This approach minimizes
the performance impact on your production workload. You can use Data
Sync to keep these two databases synchronized.
Globally Distributed Applications: Many businesses span several
regions and even several countries/regions. To minimize network
latency, it's best to have your data in a region close to you. With
Data Sync, you can easily keep databases in regions around the world
synchronized.
When you create the SQL database, you can migrate the schema or data to Azure with many tools, such as Data Migration Assistant(DMA).
Then Set up SQL Data Sync between Azure SQL Database and SQL Server on-premises, it will help sync the data auto every 5 mins.
Hope this helps.
If you want to start on the less expensive options in Azure, go with a general purpose SQL database and an Azure Data Factory pipeline with a few activities.
Dynamic Resource Scaling ETL
You can scale up the database by issuing an alter database statement and then move onto your stored proc based ETL. I would even use a "master" proc to call the dimension and fact proc's to control the execution flow. Then scale down the database with another alter database statement. I even created my own stored proc to issue these scaling statements.
You also cannot predict when the scaling will be completed, so I have a wait activity. You could be a little more nerdy with a loop that checks the service objective property and then proceeds when it is complete. But it was just easier to wait for 10 minutes. I have only been burnt a couple times when the scaling took longer.
Data Pipeline Activities:
Scale up, proceed if successful
Wait about 10 minutes, proceed always
Execute the ETL, proceed always
Scale down
Elastic Query
You can query across databases with vertical partition Elastic Query. Performance isn't great, and they don't recommend it for ETL, but it will work. To improve performance try dumping any large table you need into a temp table and then transform the data locally.

Automating (DevOps) the deployment of SQL Server Databases with Large Datasets

I'm in the middle of a DevOps project automating the deployment of apps of varying code stacks and DB's using a variety of DevOps Tools. I am seeking advice on automating an MS SQL DB deployment and subsequent updates.
Current approach is to build DB VM via a VM blueprint using Terraform or Cloudify. I currently have a VM with MSSQLServer configured and can script sql files against it to instantiate my DB. However once i get to scripting the raw data, size-wise,I often run out of memory. I know, manually i can increase memory etc in properties or use a sql file in CLI. I also know of things like DTS or BCP but what I think I am looking for is advice on best methods in automatically deploying an MS SQL DB via a DevOps pipeline. The intention is to use jenkins and deploy scripts via a power-shell.
Initial thoughts were to force DB owners to provide a bak/mdf file and subsequent updates are scripted. But I'd really appreciate council on best approaches in business especially if you have done this on large scale e.g. 1000's of apps.
If it helps the nature of my pipeline the approach I take needs to work for both small DB's 100MB, and larger ones - say up to 1-2TB.
Another approach (as of early 2018) is to use SQL Server database cloning, which restores a full byte copy of a set of databases into a Windows Virtual Hard Drive (VHD), which the supports delivery of clones (differencing disks) with mountable replicas. Clones can be mounted t conventional SQL Server instances or containers, and you can check out cloning support from Red Gate and Windocks.

The fastest backup/restore strategy for Azure SQL databases?

What is the fastest way to backup/restore Azure SQL database?
The background: We have the database with size ~40 GB and restoring it from the .bacbac file (~4GB of compressed data) in the native way by Azure SQL Database Import/Export Service takes up to 6-8 hours. Creating .bacpac is also very long and takes ~2 hours.
UPD:
UPD.
Creating the database (by the way transactional consistent) copy using CREATE DATABASE [DBBackup] AS COPY OF [DB] takes only 15 minutes with 40 GB database and the restore is simple database rename.
UPD. Dec, 2014. Let me share with you our experience about the fastest way of DB migration schema we ended up with.
First of all, the approach with data-tier application (.bacpac) turned out to be not viable for us after DB became slightly bigger and it also will not work for you if you have at least one non-clustered index with total size > 2 GB until you disable non-clustered indexes before export - it's due to Azure SQL transaction log limit.
We stick to Azure Migration Wizard that for data transfer just runs BCP for each table (parameters of BCP are configurable) and it's ~20% faster than approach with .bacpac.
Here are some pitfalls we encountered with the Migration Wizard:
We run into encoding troubles for non-Unicode strings. Make sure
that BCP import and export runs with same collation. It's -C ... configuration switch, you can find parameters with which BCP calling
in .config file for MW application.
Take into account that MW (at least the version that is actual at the moment of this writing) runs BCP with parameters that will leave the constraints in non-trusted state, so do not forget to check all non-trusted constraints after BCP import.
If your database is 40GB it's long past time to consider having a redundant Database server that's ready to go as soon as the main becomes faulty.
You should have a second server running alongside the main DB server that has no actual routines except to sync with the main server on an hourly/daily basis (depending on how often your data changes, and how long it takes to run this process). You can also consider creating backups from this database server, instead of the main one.
If your main DB server goes down - for whatever reason - you can change the host address in your application to the backup database, and spend the 8 hours debugging your other server, instead of twiddling your thumbs waiting for the Azure Portal to do its thing while your clients complain.
Your database shouldn't be taking 6-8 hours to restore from backup though. If you are including upload/download time in that estimate, then you should consider storing your data in the Azure datacenter, as well as locally.
For more info see this article on Business Continuity on MSDN:
http://msdn.microsoft.com/en-us/library/windowsazure/hh852669.aspx
You'll want to specifically look at the Database Copies section, but the article is worth reading in full if your DB is so large.
Azure now supports Point in time restore / Geo restore and GeoDR features. You can use the combination of these to have quick backup / restore. PiTR and Geo restore comes with no additional cost while you have to pay for
Geo replica
There are multiple ways to do backup, restore and copy jobs on Azure.
Point in time restore.
Azure Service takes full backups, multiple differential backups and t-log backups every 5 minutes.
Geo Restore
same as Point in time restore. Only difference is that it picks up a redundant copy from a different blob storage stored in a different region.
Geo-Replication
Same as SQL Availability Groups. 4 Replicas Async with read capabilities. Select a region to become a hot standby.
More on Microsoft Site here. Blog here.
Azure SQL Database already has these local replicas that Liam is referring to. You can find more details on these three local replicas here http://social.technet.microsoft.com/wiki/contents/articles/1695.inside-windows-azure-sql-database.aspx#High_Availability_with_SQL_Azure
Also, SQL Database recently introduced new service tiers that include new point-in-time-restore. Full details at http://msdn.microsoft.com/en-us/library/azure/hh852669.aspx
Key is to use right data management strategy as well that helps solve your objective. Wrong architecture and approach to put everything on cloud can prove disastrous... here's more to it to read - http://archdipesh.blogspot.com/2014/03/windows-azure-data-strategies-and.html

Export production database for developers

We're developing a web application backed by SQL Server. There will only ever be one instance, so the canonical method of creating the baseline database on a development machine is to copy down the production database.
We keep all pending database changes as SQL scripts, so at any time the developer can get a copy of production and then apply all the applicable SQL scripts.
The production database contains sensitive information that shouldn't be on development machines. I'm looking for a good way to export the database and package it for developers in a format that's easy to import.
I've answered this question with the way I do it now, but I'm hoping there's a better way.
I take a backup of the production database and restore it on another machine. Then I run a script to delete all the sensitive data. (I could also prune the data here if it was too large for development.) Then I backup this database and make the file available to developers.
Backing up twice seems inefficient, but I don't want developers to have the sensitive data on their machines even temporarily.
(I trust the developers to not misuse the sensitive data, but if one of their laptops was stolen or otherwise compromised, I don't want to have to worry about the potential security breach.)

Replicating / Cloning data from one MS SQL Server to another

I am trying to get the content of one MSSQL database to a second MSSQL database. There is no conflict management required, no schema updating. It is just a plain copy and replace data. The data of the destination database would be overwritten, in case somebody would have had changed something there.
Obviously, there are many ways to do that
SQL Server Replication: Well established, but using old protocols. Besides that, a lot of developers keep telling me that the devil is in the details and the replication might not always work as expected and that is this best choice for an administrator, but not for a developer.
MS Sync Framework: MSF is said to be the cool, new technology. Yes, it is this new stuff, you love to get, because it sounds so innovative. There is the generic approach for synchronisation, this sounds like: Learn one technology and how to integrate data source, you will never have to learn how to develop syncing again. But on the other hand, you can read that the main usage scenario seems to be to synchronize MSSQL Compact databases with MSSQL.
SQL Server Integration Services: This sounds like an emergency plannable solution. In case the firewall is not working, we have a package that can be executed again and again... until the firewall drops down or the authentication is fixed.
Brute Force copy and replace of database files: Probably not the best choice.
Of course, when looking on the Microsoft websites, I read that every technology (apart from brute force of course) is said to be a solid solution that can be applied in many scenarios. But that is, of course, not the stuff I wanted to hear.
So what is your opinion about this? Which technology would you suggest.
Thank you!
Stefan
The easiest mechanism is log shipping. The primary server can put the log backups on any UNC path, and then you can use any file sync tools to manage getting the logs from one server to another. The subscriber just automatically restores any transaction log backups it finds in its local folder. This automatically handles not just data, but schema changes too.
The subscriber will be read-only, but that's exactly what you want - otherwise, if someone can update records on the subscriber, you're going to be in a world of hurt.
I'd add two techniques to your list.
Write T-SQL scripts to INSERT...SELECT the data directly
Create a full backup of the database and restore it onto the new server
If it's a big database and you're not going to be doing this too often, then I'd go for the backup and restore option. It does most of the work for you and is guaranteed to copy all the objects.
I've not heard of anyone using Sync Framework, so I'd be interested to hear if anyone has used it successfully.