Hide weekends on WPF toolkit chart - wpf

I am making a small app that plots financial price data and since the finance markets are closed on the weekends, I have no data for those days. By default the chart, found in the new WPF Toolkit, shows a large gap between Friday and following Monday and this behaviour is not acceptable. I am trying to figure out a way to "hide" the weekend gaps but can't seem to find any good solutions. So far, I figured that I would have to overload the standard DateTime struct (how?) which will be able to recognize and skip weekends and holidays. I am looking for suggestions and/or pointers before I start down that slippery slope.
Some more details:
I am given a wide range of data - currently daily closing prices on NYSE. I am using the DayTimeAxis to plot the independent variable of LineSeries which is of type DateTime. It currently simply plots all the prices, one day at a time - and that's where the devil is, it shows wider gaps due to lack of data for Saturdays and Sundays and some major holidays.
I will eventually have to show more detailed (hourly, minute) chart once data becomes available, but the problem will remain if the user will want to view hourly data for some Friday and the following Monday.

After much playing around with various options, I ended up using the CategoryAxis instead of DateTimeAxis. It treats each day as a category without inferring the relationship between the days.
The data can still be kept as DateTime objects for any necessary calculations and you just have to worry about the ToString (that's what CategoryAxis to label each category). Or just throw them all in as strings - technically calculations are done on the data points, not the array of dates so not much of a loss here...

If you will plot candlestick or ohlc you can't go with toolkit (you can but it will be VERY unpleasant) if you are open to use component use visifire's the one you may go. if you can't figure it out with that send a sample code please.

Completely off the top of my head, so I'm not sure how feasible this would be, but could you possibly set up a value converter on the Width property of the data point that would return "Auto" on a weekday and 0 for a weekend?

Related

Add predictor to model quantile function in Tableau

Does anyone know how to get a model quantile function to project into future using a predictor variable/measure? I have support ticket volume I'm trying to predict using previous months and another measure.
MODEL_QUANTILE(0.5,SUM(Volume),ATTR(DATETRUNC('month',[fiscal date])),SUM(Time / User (min)]))
If I take out the last predictor (Time/User) it produces a smooth curve into future, but only gives me until this month if I have it in. Both measures stop at this month, and I've tried "Infer Properties from Missing Values" and "Extend Date Range"

Data Studio Time Series Chart Last 6 Month based on Date Filter EndDate

Can I have a time series chart to display the last 6 months QTY sold? as the report filter is monthly based.
ex. Users can choose 2021/10/01 - 2021/10/31 to view the report and there is a chart to display the last 6 months QTY sold. In this case, the time series chart will display 2021/05/01 to 2021/10/31.
If users can choose 2021/06/01 - 2021/6/30 to view the report and there is a chart to display the last 6 months QTY sold. In this case, the time series chart will display 2021/01/01 to 2021/06/30.
Through my advanced knowledge of the platform, I am not aware of the possibility of obtaining the mentioned result.
It is not possible to use the date filter control element and the respective date range as an input variable to define the period dimension used in the temporal graph.
You will probably have to look for an alternative solution that doesn't match the proposed objective. Using a fixed period of the last 6 months, without the possibility of dynamic variation through the date control element. Or, use two date filter control elements, one for the time graph only. Solutions far from ideal.
The issue was solved, I created another data source for 6 months of sales.

Comparation Periods in Google Data Studio

I'm creating a in google data studio that has a table behind with data by day.
I need it to be comparable with the month before, but there's a catch that I'm currently stuck!
The period should be something like:
DAY(date)/MONTH(date)-1/YEAR(date)
This allows the comparation between periods with different number of days, example:
Date of analysis: 28/06/2021 - 27/07/2021
Date of comparation: 28/05/2021 - 27/06/2021
When trying to create something like this in DataStudio (with date range controls) none of the options does this, and for what I've explored, there isn't an option to do a formula like the one above.
The closest I get is "Previous Period" but that makes the Date of Comparation 29/05/2021 - 27/06/2021, missing the 28/05/2021.
I'm really stuck and running out of ideas, I've even considered changing the SQL query behind to convert the days somehow.
I've done this by mocking the dates for the comparator.
The other way is to create two series, and don't use the comparator.
Series #1 will have label 28/06/2021 and data from 28/06/2021 (current period).
Series #2 will have label 28/06/2021 (the same) and data from 28/05/2021 (previous period).
They plot nicely:

Keep PivotTable report filter after data refresh

I have a PivotTable (actually it is five PivotTables, each on its own separate sheet) that is created from a query of an outside database. Each of the PivotTables represents a day (i.e. Today, Tomorrow, Today+2, Today+3, and Today+4). For the report filter for the first two, we use a date range filter of today and tomorrow which automatically filters the data and allows it to roll over. We created custom date ranges for the other three days, but upon every external data refresh we have to go into each sheet and reselect the report filter from all to the specified time frame. This data rolls over every day so we can see the lineup for the next 96 hours out.
Is there a way to either keep the PivotTable report filter criteria (VBA and macros are both acceptable, although we are also fairly new to both)?
Or is there some super secret way to extend the report filter from just today and tomorrow to a time range (48 hours, 96 hours) instead of next month?
I need the days to be separated, so next week will not work because all the days will populate on one page.
Without seeing a real example it's hard to tell, but how about changing the query to a relative date index, i.e. something like
SELECT DATEDIFF('day', GETDATE(), report_dt) AS days_from_today FROM reporting_table
And then set your report filters on this relative date index (days_from_today = 1 for tomorrow, etc)? You can always create another Excel column in the report =TODAY() + days_from_today to get your absolute date back. (Assuming you are just dealing with one time zone for reporting purposes.)
I.e., instead of rolling filters, keep the filters on constant indices, and let the indices cover a rolling date range. I'm not sure Excel is smart enough to do the rolling filters thing.

Reporting Services Chart - Hard Coded Series

I am developing an SSRS 2008 report which contains a number of simple charts. On the x axis I have the 12 months of this year - Jan 2009 thru December 2009. On the Y is an integer value ranging from 0 to 100 in increments of 10. I am plotting the number of times an issue occurred per month. So January could have a value of 10, February 30, etc. etc.
I would like to have a horizontal line/series that is constant and shows the yearly average for 2008. So, say the average was 30 issues per month in 2008, I would like for that line to be shown in my chart. Basically, I want to draw a straight line across the chart for that value... I can see how to add more complex series, but this seemingly simple task is getting the better of me.
Doe anyone have any idea how this could be accomplished?
Thanks in advance,
Jason
[Update] To add some further details, I am already pulling the average for each row in my dataset and have it set up as its own series. However, rather than plotting a line, this approach plots individual points for each month. While this is close to what I want, I need to join the dots so to speak. The chart is of the Error Bar (Range) variety.
Can you use a column / line hybrid chart? If so then add a constant or dynamic target value to the chart:
Design the chart.
On the Data tab in the Chart Properties dialog box, add a new data value (for example, Target).
Set the target value (see the example in Figure 9 on link this uses a constant target value of 100000 across all categories but you can do it dynamically too). Make sure to use an expression starting with = (equals). Otherwise, the value is not interpreted as a numeric value.
See the example on the MS charts page at http://msdn.microsoft.com/en-us/library/aa964128.aspx
Add the yearly average to each row in the underlying the query. Add data series on just that value.
I managed to solve this issue myself.
As I mentioned, I was using an Error Bar graph. Right-clicking on the series of interest, I was able to change the graph type for that particular series - essentially leaving me with a chart with multiple graphs in it...particularly simple if you know where to look - which i did not! Thanks everyone for your suggestions.

Resources